3 Commits

Author SHA1 Message Date
a9f0e75e1b Add Operations - External Process page for vendor processing tracking
Two-tab dashboard tracking external labor workflows (e.g., tin plating):
- Tab 1 "At Vendor": Open POs for outside process items (EXTLAB classcode),
  showing vendor, PO#, finished/manufactured/ext labor PNs, qty, ship date,
  expected return (7-day default), days out, and WO demand
- Tab 2 "Awaiting Shipment": WOs with manufactured material issued but no
  open PO for the outside process item, showing days waiting in stockroom

Nav button added to all 11 pages in Operations section (rows 56-60).

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-03 14:41:49 -04:00
b5e74cebb7 Add Operations - WO Shortages page with MTS/MTO shortage tracking
Automates the production manager's manual workflow of checking xTuple WO
Schedule + Kit Material Shortage for FA department work orders. Two tabs:
WO Shortages (detail per WO + shortage line with customer name, YYYY-MM-DD
dates) and Critical Parts (aggregated parts blocking near-term shipments
with QOH from MPE warehouse). Nav button added to all pages.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-03 13:47:58 -04:00
9fc5f608d4 System generated commit, initial commit 2026-04-03 16:24:02 +00:00