Two-tab dashboard tracking external labor workflows (e.g., tin plating):
- Tab 1 "At Vendor": Open POs for outside process items (EXTLAB classcode),
showing vendor, PO#, finished/manufactured/ext labor PNs, qty, ship date,
expected return (7-day default), days out, and WO demand
- Tab 2 "Awaiting Shipment": WOs with manufactured material issued but no
open PO for the outside process item, showing days waiting in stockroom
Nav button added to all 11 pages in Operations section (rows 56-60).
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
Automates the production manager's manual workflow of checking xTuple WO
Schedule + Kit Material Shortage for FA department work orders. Two tabs:
WO Shortages (detail per WO + shortage line with customer name, YYYY-MM-DD
dates) and Critical Parts (aggregated parts blocking near-term shipments
with QOH from MPE warehouse). Nav button added to all pages.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>